Find Us On FaceBook
     
     
You are here:  > Home > Gratiot Area Water Authority
     

Gratiot Area Water Authority

 

The Cities of Alma and Saint Louis working together created the Gratiot Area Water Authority. The Authority will be providing water to the Cities of Alma and Saint Louis as well as sections of Pine River Township and Bethany Township.  To create one water system, the Authority will need to:

  • Develop a new well field
  • Connect the well field to the water treatment facility
  • Expand and upgrade the water treatment facility
  • Connect the water treatment facility to the Saint Louis water distribution system; and,
  • Expand the water storage in the City of Saint Louis.
Each of these phases will be a major construction project.  The engineering for much of the project is nearing completion.  Under our current schedule, the Authority will be placing several phases out for bid yet this year. The construction of the water main on Begole Road was the first project of the Water Authority. The balance of the construction will be starting soon after the beginning of the new year.
 
 
 
Gratiot Area Water Treatment Plant Expansion Project
 
  GAWA Treatment Plant Expansion Project
 
 
MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY
Water Resources Division
P.O. Box 30458
Lansing, Michigan 48909-7958
 
File No.: 2014-002
Date: May 6, 2014
 
PUBLIC NOTICE

The Michigan Department of Environmental Quality (MDEQ) has received a water withdrawal permit application by the Gratiot Area Water Authority. The proposed groundwater withdrawal of 3.56 million gallons per day capacity is for replacement of the existing City of St. Louis community water supply. Groundwater contamination resulting from a nearby Superfund site has been detected in the City of St. Louis water supply , with a likelihood of even greater susceptibility in the future. The proposed withdrawal locations are removed from the contamination area, and in the vicinity of the City of Alma community water supply wells. The cities of Alma and St. Louis have together formed the Gratiot Area Water Authority to create a shared water supply to service the neighboring communities. The proposed withdrawal wells are located in Sections 4 and 8 of Arcada Township, T11N R03W, Gratiot County.

The MDEQ provides this public notice and a public comment period of not less than 45 days before making a determination on the application. The water withdrawal permit application can be viewed at http://www.michigan.gov/documents/deq/deq-wrd-swas-glsu-gawa_ww_permitapp_454520_7.pdf

Written comments are being accepted on the proposed permit and should be sent to Andrew LeBaron by e-mail at mailto:lebarona@michigan.gov or by mail to Michigan Department of Environmental Quality, Water Resources Division, P.O. Box 30458, Lansing, Michigan 48909- 7958. Comments received by July 3, 2014, will be considered in the permit decision prior to

final action. Persons desiring information regarding this permit application or the permit process should contact Andrew LeBaron at 517-284-5563 ; or lmailto:ebarona@michigan.gov

Quick Links

Raw Water Transmisson Main 2016 Presentation 

GAWA-St Louis Water Supply Wells 10 & 11 80% Review Alma Plan Set Raw Water Transmission Main

GAWA-St Louis Water Supply Wells 10 & 11 80% Review Arcada Plan Set Raw Water Transmission Main

GAWA-St Louis Water Supply Replacement-Wells 10 & 11   30 % Raw Water Transmission Main

October 23, 2012 Community Forum Presentation